Methodology

How Freighthub is researched, written, reviewed and corrected — and how much weight to give each kind of claim.

1. The question comes first

Every page starts with the decision a shipper faces: which port, which mode, who clears, what certificate, how much, how long, what goes wrong. The page is organised around that decision, not a template, which is why the H2 order differs between countries and ports.

2. Three kinds of statement

The labels tell the reader what can be checked and what is opinion.

3. Source hierarchy

When sources conflict, we resolve in this order; an official document beats any description of it.

  1. Primary official documents. Customs regulations, tariff schedules and e-service guidance; standards and their scope; port tariffs; tax filing rules; IMO and IATA instruments — read in the original where the desk can.
  2. Peer-reviewed and institutional research. Academic work on trade logistics, and World Bank, UNCTAD, ITC or WTO datasets: used for baselines and direction, rarely for a live price.
  3. Industry publications. Carrier and terminal notices, recognised trade press, freight indices — reliable on what is happening, weaker on why, often wrong on rules.
  4. Industry commentary. Forwarder guides and practitioner posts, treated as a claim.

4. What is never used as a sole source

Useful for orientation, never the only basis for a published claim:

Each can be right; none can be checked.

5. The verification steps before publication

  1. Claim inventory — every assertion listed against a source; the source is opened, not recalled, and must say what the draft claims.
  2. Currency — is the rule still in force, or superseded?
  3. Second check on numbers — anything a reader might budget against is confirmed independently, or published as a range with its basis.
  4. Label and range check — as-of date, shipment assumed, inclusions and drivers present; fact, claim and judgement distinguishable.
  5. Consistency — the page agrees with the pages it links to, or says why it differs.
  6. Link check — each external link resolves to the document described.
  7. Sign-off — the person who publishes answers for it.

If a step fails the claim is removed, not softened: a hedged sentence nobody can support is still unsupported.

6. How ranges are set and labelled

Ranges are built, not remembered: a base port-to-port or airport-to-airport band at a stated date, plus origin handling, destination charges, duty and VAT where they apply, the inland leg, and a buffer for the known failure modes on that lane. Bands come from published indices or carrier rate levels, add-ons from tariff schedules.

Every range states when it was built, the shipment it assumes (usually one 40ft container, port-to-port, or one cubic metre for LCL), what is included, and what would move it most. It is labelled planning range, not a quotation, and a range over two quarters old is flagged.

7. Worked examples and simulations

Some pages use a worked example or simulation: a constructed shipment showing how a decision plays out, labelled where it appears with its assumptions — commodity, value, volume, route, Incoterm, month — and which figures are illustrative.

A simulation is not evidence. It describes no real shipment, company or forwarder price, and must not be cited as a benchmark. Its job is to make a mechanism visible: how duty stacks on freight, where a demurrage clock starts.

8. Language, translation and terminology

Most primary documents here are Arabic or Chinese. They are read in the original where the desk can; where it cannot, the page says which translation it relied on, and an official English version is used where one exists.

First use of a foreign term gives the original with a plain-English gloss. Official English names are preferred to translations of convenience; where a rendering is contested, the page uses the authority's own and notes the variant. HS codes are given at heading level unless a subheading is the point.

9. What we will not publish

10. How the pages are built

A major page normally carries a direct answer in the first hundred words, a key-facts table, cost and transit drivers as ranges, failure modes, a labelled judgement, an FAQ, sources, an update log and related links. Not every page uses every module: a comparison leads with a verdict, a port page with the terminal.

11. Automation: what is checked by machine, and what is not

Freighthub does not run an automated fact-checker. No tool reads a page and confirms its claims, and nothing is published because a model was confident.

Automation is narrow and mechanical: research support (finding documents a person then opens), drafting and copy-editing, and checks on form — a failed build, missing metadata, a malformed table, a bad date format, a dead link. Those catch presentation defects; they cannot tell whether a sentence is true.

Every step in section 5 is done by a person, and so are the judgement calls; the desk is accountable for what is published and a model is not. A sentence published without verification is a defect.

12. Dates, review cadence and updates

Review follows how fast the facts move, not a single calendar:

A review is recorded as a change to the last reviewed date: the page was checked for accuracy, stale ranges and broken links, not rewritten. The updates feed states what changed, why it matters and what to do.

13. Corrections

Errors are corrected on the page and logged in corrections: a correction is a factual fix, a clarification a wording fix, an update new information. We do not silently delete pages to avoid a correction.

14. What this site is not, and how to reach it

Freighthub is not a forwarder, broker, carrier or marketplace. The advice is general and should be checked against current regulations and the specific shipment; the disclaimer sets out those limits.

Questions, corrections and source suggestions go to the editorial desk. Personal data is covered by the privacy notice; reuse of the text by the terms.